logo
  • Español
  • Euskara
  • English
  • Français
  • A.1 THE PROJECT FOR THE RESTORATION AND SHOWCASING OF THE PUNTA BEGOÑA GALLERIES
  • A.2 LONG YEARS OF ABANDONMENT
  • A.3 A MOVE WITH SIGHTS SET ON THE FUTURE
  • A.4 STRICT ACCURACY IN RESTORING AND SHOWCASING THE SITE
  • A.5 A PARTICIPATIVE PROCESS IN THE SERVICE OF SOCIETY
  • A.6 THE TOUR: GETTING TO KNOW THE GALLERIES
  • B.1 PUNTA BEGOÑA 100 YEARS AGO
  • B.2 THE CURRENT LANDSCAPE: THE MAIN IMPACTS ON THE GALLERIES
  • B.3 NEW AREAS TO BE DISCOVERED
  • B.4 THE RURAL GETXO OF THE PAST
  • B.5 THE WEATHER AT PUNTA BEGOÑA
  • B.6 TAKING SAMPLES TO ANALYSE THE SOIL IN THE GARDENS
  • B.7 DEFENDING THE EL ABRA BAY: THE BEGOÑA GUN BATTERY
  • B.8 GETXO UNDER THE SEA
  • B.9 FLAT LAND AND CLIFFS
  • B.10 THE AGE OF THE ROCKS
  • B.11 BEYOND PUNTA BEGOÑA. A LOOK AT THE LANDSCAPE
  • C.1 SYMBOL OF AN ERA
  • C.2 1919: THE CLASSICAL STYLE IS FASHIONABLE
  • C.3 THE TERRACING WALL UP TO THE GALLERY
  • C.4 DEVELOPER & ARCHITECT: THE MEETING
  • C.5 AN ESSENTIAL VISIT TO THE ARCHIVES
  • C.6 THE PROJECT THAT WAS GRADUALLY ADAPTED TO THE SITE
  • C.7 PIONEERING USE OF REINFORCED CONCRETE
  • C.8 BAY WINDOWS IMPORTED FROM ASIA
  • C.9 WHY THE GALLERIES WERE BUILT
  • C.10 SAND AND LIME
  • C.11 SEVILLE-STYLE DÉCOR
  • C.12 THE ELEGANCE OF MARBLE
  • C.13 UNFORESEEN USES OF THE GALLERIES
  • C.14 THE TRANSITIONAL AREA: THE ENTRANCEWAY TO THE HALL
  • C.15 IF WE LOSE OUR MEMORIES, WE LOSE OUR IDENTITIES
  • D.1 SUBSIDENCE CONTROL EQUIPMENT
  • D.2 TECHNIQUES FOR ANALYSING THE MATERIALS IN THE GALLERIES
  • D.3 BUILDING STABILITY: STRUCTURAL SURVEY
  • D.4 THE STALACTITE PHENOMENON
  • D.5 APPEARANCE OF THE BLACK CRUST
  • D.6 HONEYCOMB WEATHERING
  • D.7 MONITORING CRACKS
  • D.8 WHAT THE EYE CANNOT SEE: GEO-RADAR
  • D.9 GROUNDWATER
  • D.10 VERTICAL LIMIT
  • D.11 SUPPORTING THE GALLERIES
  • D.12 THE EFFECTS OF WATER
  • D.13 MONITORING MOVEMENTS UNDER THE HALL
  • D.14 RUSTING ON THE REINFORCED CONCRETE
  • D.15 BRICKS TURN TO DUST
  • D.16 GRAFFITI FROM THE 1980S
  • E.1 DROPPED CEILINGS: A CHANCE TO LEARN
  • E.2 A STROLL AMONG PARTERRES AND FLOWER BEDS
  • E.3 REMOVING FILLINGS
  • E.4 PREVENTIVE SHORING
  • E.5 CLEANING OFF THE INK FROM GRAFFITI
  • E.6 REMOVING LIMESCALE
  • E.7 REMOVING AIRBORNE POLLUTANTS
  • E.8 ACCESS THANKS TO THE MATRIOSHKA© SYSTEM
  • E.9 REDISCOVERING CONCEALED AREAS
  • E.10 REMOVING OFF-WHITE PATINAS
  • E.11 REMOVING RUBBLE
  • E.12 WATERPROOFING THE HALL
  • E.13 TURNING WEAKNESSES INTO OPPORTUNITIES

© Copyright 2018 · Punta Begoña Getxo